Hot Lab Preparations:
A short document on required lab preparations can be found here (in a little bit. LIB is updating now...1/14/13).
Power: 115 Vac and 208 Vac will both be updated.
Water: Chilled water or tower water? We need to decide how to control chillder water temp to prevent condensation.
Lab Cleanup: Na-22 trash, cabinets, random stuff
Floor: Cleaning and resealing. Asbestos abatement required for cracked tiles?
Walls: Removal of water/air lines on S wall. RGHR will select a paint color.
Lab Layout: Latest arrangement (check date in corner). It is also posted on the corkboard in the Hot Lab.
Rack Layout: Latest rack arrangement plan.