Laboratory Preparations

Hot Lab Preparations:

A short document on required lab preparations can be found here (in a little bit.  LIB is updating now...1/14/13). 

 

Power: 115 Vac and 208 Vac will both be updated.  

Water: Chilled water or tower water?  We need to decide how to control chillder water temp to prevent condensation.  

Lab Cleanup: Na-22 trash, cabinets, random stuff

Floor: Cleaning and resealing.  Asbestos abatement required for cracked tiles?

Walls: Removal of water/air lines on S wall.  RGHR will select a paint color.


Lab Layout: Latest arrangement (check date in corner). It is also posted on the corkboard in the Hot Lab.

Rack Layout: Latest rack arrangement plan.